Antelope

Campbell & Converse Counties, WY

OVERVIEW

Antelope Mine began operations in 1985 with a permitted mining capacity of 42 million tons per year. Current mining involves dual seams with a coal seam thickness of 32 feet to 36 feet. Mining is carried out primarily by dragline operations, with truck/shovel operations utilized to remove coal.

Antelope Mine Key Facts

Type of Coal: 8,850 Btu Thermal Coal

Type of Mine: Surface

Typical Annual Production: 20-25 million tons annually

Storage capacity (processed): 27,500 tons

Rail Service: UP & BNSF

Rail Loading Point: Converse Junction, WY

Rail Loading Capabilities: Full loop, with 4 unit-train capacity

Accountability

Conscientious Energy Development

Value

Empowering People

Looking for Employment Opportunities?

Cordero Rojo

Campbell County, WY

OVERVIEW

Cordero began operations in 1976 and currently has a permitted mining capacity of 65 million tons per year in conjunction with the Caballo Rojo Loadout. Mining is carried out primarily by dragline operations, with truck/shovel operations utilized to remove coal.

Cordero Rojo Mine Key Facts

Type of Coal: 8,450 Btu Thermal Coal

Type of Mine: Surface

Tonnage: 30 million tons annually

Storage capacity (processed): 144,000 tons

Rail Service: UP & BNSF

Rail Loading Point: Cordero Junction, WY

Rail Loading Capabilities: Double loop (two trains can be loaded at once), 4 train capacity,

Awards

  • 2015 State of Wyoming Excellence in Surface Mining
  • 2015 Excellence in Surface Coal Mining Reclamation Award
  • 2018 Sentinels of Safety Winner (6 time Sentinels Winner)
  • 2019 Wyoming Mining Association/State Mine Inspector Surface Mine Safety Award – Large Mine Category
Cordero Rojo Manager:

Kyle Colby
Kyle.Colby@NavEnergy.com

Looking for Employment Opportunities?